Al Ain Hospital Fence Design ( Abu Dhabi UAE ) 

My task was to design a fence in the south boundary of the site, with all the structural details. The fence was 630 m long and because of the topography we had to make a retaining wall among it length. The client wanted the fence to be light and transparent since it going to be very long so it won’t look bulky,I divided each 26 m with a construction joint based on Structural Engineer calculations, then I made a modular of the fence each 2.6 m width.after that I made 24 sections at the end of each construction joint so we can understand what is happening at that point and with collaboration with structure engineer we calculate the length and depth for concrete bed foundation for each point.

since the fence is not horizontal I had to measure the angle between each plinth and horizontal line

Logo_Obermeyer_svg.png

Restoration OBERMEYER Planen + Beraten GmbH Headquartered  München Germany.

The design of the floor is an open plan with a middle core for services such as stairs, elevator and bathrooms. We had to rethink about the office open space and to provide it with meeting rooms each floor, so my task was to redesign the meeting boxes with contrast with the surrounding area.

So the main reason for change is the Design from the 80s / 90s Traditional, / not  innovative in the architectural language /Missing or few uninviting areas of communication / Upcoming necessary fire protection renovation

Frankfurt Airport controlling room renovation (Material Concept)

Since it is the most important airport in Germany and in Europe , they bought new technical controlling equipment and they wanted to renovate the whole area specially the controlling rooms, so my task was to adjust the chosen material in interior shots for the controlling room with several option for the furniture .I made many options and they agree with this option oak and dark grey.

Frankfurt Airport WC renovation (interior)

 Frankfurt Airport is the most important airport in Germany and in Europe, they must keep their services quality high for the passengers and workers, so they had to renovate the WC’s in Terminal 1 for public and for the crew .I worked with my colleague Gesa Schnorr.  My task was to draw elevations, sections , plan and details for the interior, Also I had to tag all the products in the bathrooms with their manufacture so we can make order for it and to attach dimension and tiles in all of the sections plans and elevations.

Jüdische Krankenhaus in Berlin (The Jewish Hospital in Berlin) Master Plan 

So my task was to add on the site plan the streets, new extension buildings , shade and shadows with the flows of the pedestrian and vehicle movement and diagrams that explain the relation between the new added building and the old one